Title :
Early experience of an interconnected system in the Yemen Arab Republic
Author :
Ritchie, W.M. ; Warham, T.J.
fDate :
7/1/1987 12:00:00 AM
Abstract :
The provision of an interconnected power system for the Yemen Arab Republic provided the authors´ company with major practical problems concerned with both the onerous conditions and also an unexpected geographical shift in demand growth
Keywords :
power system interconnection; Yemen Arab Republic; commissioning; interconnected system; power system; system performance assessment;
Journal_Title :
Power Engineering Journal
DOI :
10.1049/pe:19870040