Title :
Instrumentation and monitoring equipment: provision for modern turbogenerators
Author :
Booth, R.M. ; Cross, C.S. ; Rhodes, J.R.
fDate :
11/1/1987 12:00:00 AM
Abstract :
The complexity of modern turbogenerator plant and instrumentation, and reduction in manning levels, means that instrumentation and monitoring equipment is usually located a central control room. It is now essential for instrumentation requirements to be specified at the same time as the main plant
Keywords :
computerised instrumentation; computerised monitoring; microcomputer applications; turbogenerators; central control room; computer data processing systems; control equipment; instrumentation; modern turbogenerators; monitoring;
Journal_Title :
Power Engineering Journal
DOI :
10.1049/pe:19870064