DocumentCode :
1222246
Title :
Operating reserve model in the power market
Author :
Wang, Jianxue ; Wang, Xifan ; Wu, Yang
Author_Institution :
Xi´´an Jiaotong Univ., Shaanxi, China
Volume :
20
Issue :
1
fYear :
2005
Firstpage :
223
Lastpage :
229
Abstract :
Most of the current research on operating reserve markets assumes that the required capacity is predetermined, which means that the demand of operating reserve capacity is inelastic. This paper considers that operating reserve capacity in a power system is flexible and that one should optimize it by cost-benefit analysis. Based on the reliability evaluation of the generation system, a clearing model of the operating reserve market is proposed to determine the optimal reserve capacity and simultaneously clear the operating reserve market. The model is discussed on both uniform-price and pay-as-bid auction mechanisms. By using a heuristic method, we suggest an efficient algorithm to solve the model. Case studies for reliability test system (RTS96) demonstrate the usefulness and efficiency of the proposed model.
Keywords :
cost-benefit analysis; power generation reliability; power markets; pricing; cost-benefit analysis; generation system reliability; heuristic method; operating reserve capacity; operating reserve model; pay-as-bid mechanism; power market; uniform-price mechanism; Cost benefit analysis; Maintenance; Optimal scheduling; Power generation; Power markets; Power system analysis computing; Power system modeling; Power system reliability; Spinning; System testing;
fLanguage :
English
Journal_Title :
Power Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0885-8950
Type :
jour
DOI :
10.1109/TPWRS.2004.841232
Filename :
1388513
Link To Document :
بازگشت