Titan Termination Data Control and Interconnection Cabling
Author
Fehner, E.C.
Author_Institution
Electronic Systems & Products Division Martin Company Baltimore 3, Maryland
Volume
1
Issue
2
fYear
1963
Firstpage
1161
Lastpage
1174
Abstract
The automation of termination data to control equipment interconnection cabling was a major contribution to the on-time activation of Titan I ICBM hardsites. In all, more than 700,000 terminations were controlled by automated programming of the variables that influence cable design and routing. This program enabled prefabricating the 52 miles of cabling required for each Titan site; a total of 1350 different multiconductor cable configurations are represented in the 6600 cables provided. Automated termination data control and the successful installation of 99.9% of the factory-fabricated cables were noted milestones in the Titan I activation program.
Keywords
Automatic control; Automatic testing; Automation; Communication cables; Communication system control; Control equipment; Missiles; Propulsion; Routing; Wiring;
fLanguage
English
Journal_Title
Aerospace, IEEE Transactions on
Publisher
ieee
ISSN
0536-1516
Type
jour
DOI
10.1109/TA.1963.4319490
Filename
4319490
Link To Document