DocumentCode
1229402
Title
Good Management Insures Progress
Author
Barber, David F. ; Coppola, Anthony
Author_Institution
Rome Air Development Center United States Air Force
Volume
2
Issue
2
fYear
1964
fDate
4/1/1964 12:00:00 AM
Firstpage
345
Lastpage
349
Abstract
Management omissions currently have a greater adverse effect on the achievement of Reliability than do technical limitations. A major cause for such omissions is a lack of acceptance of responsibility for Reliability by offices which in practice exert more of a significant influence on the program than do the Reliability experts. This paper describes the responsibilities of all offices involved, the knowledge required by these offices and the management tools available to them.
Keywords
Boilers; Defense industry; Design engineering; Documentation; Electronic equipment testing; Fixtures; Job shop scheduling; Knowledge management; Personnel; Reliability engineering;
fLanguage
English
Journal_Title
Aerospace, IEEE Transactions on
Publisher
ieee
ISSN
0536-1516
Type
jour
DOI
10.1109/TA.1964.4319608
Filename
4319608
Link To Document