DocumentCode
1230870
Title
Managing your EDA investments
Author
Prabhu, Ajit
Volume
12
Issue
1
fYear
1995
Firstpage
5
Abstract
Every IC/systems design manager faces the same optimization problem: how to minimize costs while maximizing productivity? Take it one or two organizational levels higher and the problem becomes even move critical. That´s because individual performance ratings and bonuses are based on metrics such as below-budget, on-time delivery for new products. The following concepts are discussed: competitive advantage, parity, and the design process; the M1-M2-M3 model; and the application of M1-M2-M3 model
Keywords
CAD; DP management; design engineering; EDA investments management; M1-M2-M3 model; on-time delivery; performance ratings; productivity; systems design manager; Cost function; Delay; Design optimization; Electronic design automation and methodology; Equations; Incentive schemes; Investments; Process design; Productivity; Stock markets;
fLanguage
English
Journal_Title
Design & Test of Computers, IEEE
Publisher
ieee
ISSN
0740-7475
Type
jour
DOI
10.1109/54.350669
Filename
350669
Link To Document