• DocumentCode
    1235096
  • Title

    Extensions of an integrated approach for multi-resource shop scheduling

  • Author

    Dauzere-Peres, Stephane ; Pavageau, Claire

  • Author_Institution
    Dept. of Finance & Manage. Sci., Norwegian Sch. of Econ. & Bus. Adm., Bergen-Sandviken, Norway
  • Volume
    33
  • Issue
    2
  • fYear
    2003
  • fDate
    5/1/2003 12:00:00 AM
  • Firstpage
    207
  • Lastpage
    213
  • Abstract
    In a previous work, we proposed an integrated approach for a rather general shop scheduling problem, with multiresource, flexibility, and nonlinear routings. In this paper, we want to overcome some of the limitations of the approach. In particular, an operation that needs several resources might not need all the resources during its entire processing time. Our first extension allows a resource to be released before the end of the operation. The second extension considers the fact that, for a given operation, one might have to prevent a set of incompatible resources to be chosen.
  • Keywords
    flexible manufacturing systems; production control; flexible job-shop; flexible manufacturing systems; incompatible resources; manufacturing systems; multiresource scheduling; optimization methods; shop scheduling problem; Assembly systems; Finance; Financial management; Job shop scheduling; Manufacturing systems; Optimization methods; Routing;
  • fLanguage
    English
  • Journal_Title
    Systems, Man, and Cybernetics, Part C: Applications and Reviews, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    1094-6977
  • Type

    jour

  • DOI
    10.1109/TSMCC.2003.814036
  • Filename
    1211128