DocumentCode :
1236816
Title :
Taking the pain out of turnarounds [plant shutdown time minimisation using turnaround management specialists]
Author :
Matthews, David
Volume :
6
Issue :
6
fYear :
2005
Firstpage :
40
Lastpage :
41
Abstract :
This article considers manufacturing companies´ annual shutdown or ´turnaround´ and how this can be minimized by employing specialists. Turnaround management specialists combine the skills of engineers and planners, who have a background in mechanical and electrical engineering, with those of cost and contract engineers, materials co-ordinators, health and safety specialists and quality assurance experts. This helps to correctly identify the tasks to be undertaken during a turnaround and in planning the time schedule required with much greater accuracy.
Keywords :
costing; health and safety; maintenance engineering; materials requirements planning; planning; quality assurance; scheduling; subcontracting; annual turnaround; contract engineering; cost engineering; engineering skills; health and safety; maintenance; materials coordination; mechanical engineering; plant shutdown time minimisation; quality assurance; time schedule planning; turnaround management specialists;
fLanguage :
English
Journal_Title :
Engineering Management Journal
Publisher :
iet
ISSN :
0960-7919
Type :
jour
DOI :
10.1049/em:20040613
Filename :
1394876
Link To Document :
بازگشت