DocumentCode :
1238420
Title :
Production status of the LHC inner triplet magnet system
Author :
Kerby, J.S.
Author_Institution :
Fermi Nat. Accel. Lab., USA
Volume :
13
Issue :
2
fYear :
2003
fDate :
6/1/2003 12:00:00 AM
Firstpage :
1229
Lastpage :
1234
Abstract :
The inner triplet magnet systems for the LHC provide the final focus of the two proton beams immediately before collision at the four interaction points in the machine. At both the high and low luminosity interaction regions, the quadrupole magnets composing the Q1 through Q3 optical elements are capable of operation at 215 T/m when cooled to 1.9 K, and subjected at the high luminosity interaction points to significant beam heating. The design and production of the system is the result of several years of international collaboration between laboratories and industries on three continents.
Keywords :
accelerator magnets; proton accelerators; storage rings; superconducting magnets; synchrotrons; 1.9 K; LHC inner triplet magnet system; Large Hadron Collider; beam heating; high luminosity interaction regions; interaction points; international collaboration; low luminosity interaction regions; production status; proton beam focus; quadrupole magnets; Assembly; Coils; Collaboration; Laboratories; Large Hadron Collider; Magnetic separation; Optical design; Optimized production technology; Production systems; Superconducting magnets;
fLanguage :
English
Journal_Title :
Applied Superconductivity, IEEE Transactions on
Publisher :
ieee
ISSN :
1051-8223
Type :
jour
DOI :
10.1109/TASC.2003.812640
Filename :
1211819
Link To Document :
بازگشت