DocumentCode
1238538
Title
Construction experience with MQXB quadrupole magnets built at Fermilab for the LHC interaction regions
Author
Bossert, R. ; Kerby, J. ; Nobrega, F. ; Lamm, M.J. ; Rife, J. ; Feher, S. ; Robotham, W. ; Schlabach, P. ; Yadav, S. ; Zlobin, A.B.
Author_Institution
Feimilab, Batavia, IL, USA
Volume
13
Issue
2
fYear
2003
fDate
6/1/2003 12:00:00 AM
Firstpage
1297
Lastpage
1300
Abstract
Fermilab is building eighteen full length cold masses for the LHC Interaction Region inner triplets. One prototype and several production assemblies have been completed. This paper summarizes the construction details. Topics include coil fabrication, ground insulation, collaring, instrumentation, electrical testing, and final assembly. In-process measurements are presented and explained. Problems encountered during construction and their solutions are discussed.
Keywords
accelerator magnets; power cable insulation; proton accelerators; storage rings; superconducting cables; superconducting coils; superconducting device testing; synchrotrons; 70 mm; Fermilab; LHC interaction region inner triplets; LHC interaction regions; MQXB quadrupole magnets; assembly; coil fabrication; cold masses; collaring; construction details; electrical testing; ground insulation; in-process measurements; production assemblies; Assembly; Buildings; Coils; Dielectrics and electrical insulation; Fabrication; Instruments; Large Hadron Collider; Magnets; Production; Prototypes;
fLanguage
English
Journal_Title
Applied Superconductivity, IEEE Transactions on
Publisher
ieee
ISSN
1051-8223
Type
jour
DOI
10.1109/TASC.2003.812653
Filename
1211835
Link To Document