DocumentCode :
1258162
Title :
Technical committee annual reports 1923–1924
Volume :
43
Issue :
8
fYear :
1924
Firstpage :
749
Lastpage :
750
Abstract :
The increasing demand for electrical energy has made necessary the interconnection of present systems and the development of additional hydroelectric power projects. These new developments are in many cases at points remote from load centers, and the transmission problems involve distances, amounts of energy, reliability, and voltages for their economic transmission in excess of previous operating practise.
fLanguage :
English
Journal_Title :
A.I.E.E., Journal of the
Publisher :
ieee
ISSN :
0095-9804
Type :
jour
DOI :
10.1109/JAIEE.1924.6534319
Filename :
6534319
Link To Document :
بازگشت