Abstract :
The increasing demand for electrical energy has made necessary the interconnection of present systems and the development of additional hydroelectric power projects. These new developments are in many cases at points remote from load centers, and the transmission problems involve distances, amounts of energy, reliability, and voltages for their economic transmission in excess of previous operating practise.