Title :
The long span across the narrows at Tacoma
Author :
Gongwer, J.V. ; Darland, A.F.
Author_Institution :
Both of the Cushman Power Project, Tocoma, Wash.
Abstract :
THE double transmission lines now being built by the City of Tacoma, as part of its new Cushman Power Development, connecting Power House No. 1 and No. 2, (future) with the Cushman Substation in Tacoma, reaches 44 mi. from the North Fork of the Skokomish River in the foot hills of the Olympic Mountains around Hood Canal, across North and Henderson Bays and over The Narrows to Tacoma.
Journal_Title :
A.I.E.E., Journal of the
DOI :
10.1109/JAIEE.1925.6534567