Title :
Experience With SF6 Gas-Insulated Substations and Proposals for Improved Reliability
Author :
Lindsay, C. ; Hick, M.
Author_Institution :
Ontario Hydro, Toronto, ON, Canada
Keywords :
Assembly; Geographic Information Systems; Impulse testing; Insulation testing; Production facilities; Prototypes; Quality control; Substations; Switches; Voltage;
Journal_Title :
Power Engineering Review, IEEE
DOI :
10.1109/MPER.1984.5525806