DocumentCode :
1261642
Title :
Abridgment of the gould street generating station of the consolidated gas, electric light and power company
Author :
Loizeaux, A.S.
Author_Institution :
Consolidated Gas, Electric Light & Power Co., Baltimore, Md.
Volume :
47
Issue :
11
fYear :
1928
Firstpage :
823
Lastpage :
827
Abstract :
The paper is descriptive of the Gould St. Plant. Pulverized coal is prepared in a separate building. Only one boiler is provided per turbine, each boiler delivering a maximum of 520,000 lb. of steam per hour. Automatic control is provided for the electric drive of boiler auxiliaries, electric auxiliaries being used throughout the plant; a 250-volt exciter and 460-volt house turbine are on main generator shaft. Switch house is of isolated phase construction with vertical operation of switches. Actual costs are given for the first unit, with estimated costs for completed plant, resulting in costs for the completed plant of $88 per kw. for normal output and $80 per kw. for maximum output.
fLanguage :
English
Journal_Title :
A.I.E.E., Journal of the
Publisher :
ieee
ISSN :
0095-9804
Type :
jour
DOI :
10.1109/JAIEE.1928.6534945
Filename :
6534945
Link To Document :
بازگشت