Title :
Thermal plant bids and market clearing in an electricity pool. Minimization of costs vs. minimization of consumer payments
Author :
Alonso, J. ; Trias, A. ; Gaitan, V. ; Alba, J.I.
Author_Institution :
Grupo Endesa, Madrid, Spain
fDate :
11/1/1999 12:00:00 AM
Abstract :
The Spanish wholesale electricity market started on January 1st 1998. Though it is based on simple price/quantity bids, it incorporates some provisions to take thermal plant running requirements into account. This paper presents these rules and its mathematical treatment, focusing on a possible implementation of the “minimum income condition”, which allows thermal generators to declare minimum stable loads. It also shows another key point in the debate: whether the algorithm should minimize costs or consumer payments
Keywords :
electricity supply industry; power system economics; thermal power stations; Spanish wholesale electricity market; consumer payments minimisation; costs minimization; electricity pool; inter-temporal links; marginal price; market clearing; mathematical treatment; minimum income condition; minimum stable loads; price/quantity bids; thermal plant bids; thermal plant running requirements; Algorithm design and analysis; Costs; Electricity supply industry; Power engineering computing; Power generation economics; Power system analysis computing; Power system economics; Power systems; Software tools; Thermal loading;
Journal_Title :
Power Systems, IEEE Transactions on