Title :
Value-based reliability for short term operational planning
Author :
Momoh, James A. ; Elfayoumy, Mahmoud ; Mittelstadt, William
Author_Institution :
Dept. of Electr. Eng., Howard Univ., Washington, DC, USA
fDate :
11/1/1999 12:00:00 AM
Abstract :
The paper presents a scheme for evaluating and optimally enhancing power system reliability for a short-time horizon operation of one week. Power system reliability can be efficiently enhanced by applying appropriate remedial actions (RAs). This paper investigates the impact of remedial actions on system reliability, the corresponding associated cost and the amount of unserved energy using the EPRI Transmission Reliability Evaluation for Large Scale System (TRELSS) program. The proposed scheme has been tested on a 27-bus example taken from the Northwest (NW) system. The method has the potential to be used for assessing the risks associated with near-term scheduled outages and other operational issues
Keywords :
power system analysis computing; power system economics; power system planning; power system reliability; value engineering; TRELSS software; computer simulation; power systems; reliability enhancement optimisation; remedial actions; short-term operational planning; unserved energy; value-based reliability; Costs; Electricity supply industry; Large-scale systems; Power industry; Power system planning; Power system reliability; Senior members; Shunt (electrical); Student members; System testing;
Journal_Title :
Power Systems, IEEE Transactions on