Title :
A Practical Approach to an Interim Multi-Area Economic Dispatch Using Limited Computer Resources
Author :
Helmick, S.D. ; Shoults, R.R.
Author_Institution :
Texas Utilities, Dallas, TX
fDate :
6/1/1985 12:00:00 AM
Abstract :
A straight forward and computationally efficient method is presented for calculating and sending ``economic´´ Area Control Error (ACE) signals to three operating companies in the Texas Utilities (T.U.) System. The method requires T.U. system ACE and each operating company´s total generation and then mathematically computes each area´s desired generation. The difference between the desired generation and the actual generation for each area is its´s economic ACE. The method features a sorted-table approach to economic dispatch and calculates the economic ACE every five seconds. It has been thoroughly tested and implemented on the Texas Utilities System.
Keywords :
Acceleration; Accelerometers; Companies; Control systems; Economics; Energy management; Microcomputers; Oscillators; Phase measurement; Power generation economics; Power system economics; Power system stability; Processor scheduling; Samarium; Static VAr compensators; Voltage control;
Journal_Title :
Power Engineering Review, IEEE
DOI :
10.1109/MPER.1985.5526642