Title :
Catenary construction for Chicago terminal electrification of Illinois Central railroad
Author_Institution :
Distribution Engineer, Illinois Central Railroad
fDate :
7/1/1927 12:00:00 AM
Abstract :
The object of this paper is to give briefly the procedure followed by the Illinois Central engineers in the layout, design and erection of the catenary system. Brief reference also will be made to the principal items of material entering into the construction and to methods of maintenance.
Journal_Title :
A.I.E.E., Journal of the
DOI :
10.1109/JAIEE.1927.6535538