DocumentCode :
1268169
Title :
Optimal Generation Planning for a Thermal System with Pumped-Storage Based on Analytical Production Costing Model
Author :
Lee, B.Y. ; Park, Y.M. ; Lee, K.Y.
Author_Institution :
Hong-Ik University, Seoul, Korea
Issue :
5
fYear :
1987
fDate :
5/1/1987 12:00:00 AM
Firstpage :
53
Lastpage :
54
Abstract :
This paper presents a new algorithm for the optimal long-range generation planning for a thermal system with pumped-storage plants. The algorithm is based upon the analytical production costing model developed under the assumption of Gaussian probabilistic distribution of random load fluctuations and plant outages. The optimization problem consists of the master problem to determine the annual investment, and the pumped-storage subproblem to determine the optimal pumped-storage operation. The master problem is formulated as a Hamiltonian minimization problem, and the pumped-storage subproblem is solved using the concept of peak-shaving operation on the original load curve.
Keywords :
Algorithm design and analysis; Analytical models; Circuit faults; Costing; Costs; Fluctuations; Investments; Load modeling; Planning; Production; Production planning; Production systems; Thermal expansion; Thermal loading;
fLanguage :
English
Journal_Title :
Power Engineering Review, IEEE
Publisher :
ieee
ISSN :
0272-1724
Type :
jour
DOI :
10.1109/MPER.1987.5527263
Filename :
5527263
Link To Document :
بازگشت