DocumentCode
126973
Title
Snow disposal operations optimization in winter highway maintenance
Author
Xie Bing-lei ; Jin Lei ; Mu Wei
Author_Institution
Shenzhen Grad. Sch., Harbin Inst. of Technol., Shenzhen, China
fYear
2014
fDate
17-19 Aug. 2014
Firstpage
227
Lastpage
232
Abstract
Under limited maintenance resources, the optimal snow disposal operation to restore capacity of highway in time, is an important decision making problem of highway maintenance in winter. Based on fluidity of snow disposal teams, a time-space network model of snow disposal operation planning was designed, which can accommodate temporal and spatial moves of snow disposal teams. In term of time windows of maintenance segments of highway and cooperation among multiple teams, a snow disposal operation planning model based on time-space network was brought up. Computational result of an example was obtained with LINGO software, where region responsibility strategy and region cooperation strategy were compared in disposal snow duration. Region cooperation strategy can improve utilization efficiency of maintenance resources adequately, to restore transportation of highway in a shorter time.
Keywords
maintenance engineering; optimisation; roads; snow; strategic planning; structural engineering; LINGO software; multiple team cooperation; optimization; region cooperation strategy; region responsibility strategy; snow disposal operation planning; winter highway maintenance; Computational modeling; Maintenance engineering; Optimization; Roads; Snow; Vehicles; region cooperation strategy; region responsibility strategy; snow disposal operations; systems engineering; time-space network model; winter highway maintenance;
fLanguage
English
Publisher
ieee
Conference_Titel
Management Science & Engineering (ICMSE), 2014 International Conference on
Conference_Location
Helsinki
Print_ISBN
978-1-4799-5375-2
Type
conf
DOI
10.1109/ICMSE.2014.6930233
Filename
6930233
Link To Document