DocumentCode :
1270320
Title :
Abridgment of “synchronized at the load” — III: System tests and operating connections
Author :
Searing, H. ; Milne, G.R.
Author_Institution :
United Electric Light & Power Company, New York, N. Y.
Volume :
48
Issue :
8
fYear :
1929
Firstpage :
607
Lastpage :
611
Abstract :
System test results, operating connections, and experience with the New York City system synchronized at the load are given. Data obtained by test are presented, showing the behavior of the system when generators are operated synchronized only through a low-voltage a-c. secondary network. The adaptation of this method of connections to the New York City 60-cycle system, including system layout, station and feeder rearrangement, and automatic recording apparatus, is described. Experience with these connections has demonstrated that stable performance of prime movers is obtained, load and wattless control is simplified, oil circuit breaker duty is reduced, and voltage fluctuation at customer´s service during system disturbances is materially decreased.
fLanguage :
English
Journal_Title :
A.I.E.E., Journal of the
Publisher :
ieee
ISSN :
0095-9804
Type :
jour
DOI :
10.1109/JAIEE.1929.6536462
Filename :
6536462
Link To Document :
بازگشت