DocumentCode :
1271402
Title :
Abridgment of transmission experience of the public service company of Colorado
Author :
Coover, M.S. ; Hardaway, W.D.
Author_Institution :
E. E., University of Colo, Boulder, Colo.
Volume :
47
Issue :
9
fYear :
1928
Firstpage :
633
Lastpage :
636
Abstract :
The 100,000-volt transmission lines of the Public Service Company of Colorado, which were completed in 1909, extended from the Shoshone hydro plant on the Colorado River across the Continental Divide to Denver and represent pioneering in high-voltage transmission at high altitudes. This combination of factors, coupled with a rapid expansion of the whole system in recent years, called for the satisfactory solution of many problems. The paper describes the system in a general way, and outlines some of the more salient operating difficulties that have arisen from time to time, as well as their remedies. Brief mention is also made of the method of load dispatching.
fLanguage :
English
Journal_Title :
A.I.E.E., Journal of the
Publisher :
ieee
ISSN :
0095-9804
Type :
jour
DOI :
10.1109/JAIEE.1928.6536653
Filename :
6536653
Link To Document :
بازگشت