• DocumentCode
    1271582
  • Title

    Abridgment of Conowingo hydroelectric project of the Philadelphia electric company system with particular reference to interconnection

  • Author

    Eglin, W.C.L.

  • Author_Institution
    The Philadelphia Electric Company
  • Volume
    47
  • Issue
    6
  • fYear
    1928
  • fDate
    6/1/1928 12:00:00 AM
  • Firstpage
    433
  • Lastpage
    436
  • Abstract
    This paper discusses the interconnection between three of the leading power supply company´s in the eastern part of the country, the Philadelphia Electric Co., the Pennsylvania Power & Light Co. and the Public Service Electric & Gas Co. It outlines the physical aspects of the tie-in between the companies which is a 220-kv. ring of high-load capacity, triangular in shape with sides respectively 49 mi., 82 mi., and 77 mi. long. The advantages of the interconnection are enumerated as well as some of the operating problems. Preliminary to the discussion of the interconnection the paper discusses the Conowingo hydroelectric project, an important factor in the interconnection scheme. The plant has an initial installation of 280,000 kv-a. in generators.
  • fLanguage
    English
  • Journal_Title
    A.I.E.E., Journal of the
  • Publisher
    ieee
  • ISSN
    0095-9804
  • Type

    jour

  • DOI
    10.1109/JAIEE.1928.6536685
  • Filename
    6536685