    A new approach to time-cost-quality tradeoff problem for construction project

  • Author

    Fu Fang ; Zhang Chao

  • Author_Institution
    Sch. of Econ. & Manage., China Univ. of Pet., Qingdao, China
  • fYear
    2014
  • fDate
    17-19 Aug. 2014
  • Firstpage
    1836
  • Lastpage
    1842
  • Abstract
    The final quality is crucial for construction project, and its level determines the probability of the quality accident; moreover, the repair work occurs frequently due to the quality at a certain time during construction; besides, quality is acknowledged to be an important component of project management, but its joint relationship with time and cost previously has not been modeled. Therefore, a non-linear stochastic programming model is constructed based on multi-mode resource constrained project scheduling problem(MRCPSP) to minimize total quality cost which is composed of prevention cost and failure cost; the binary normal distribution is adopted to describe the relation among duration, direct cost and quality of each activity; two indicators namely cumulative quality and project quality are employed to measure the level during construction and the ultimate level respectively. Furthermore, the shuffled flog-leaping algorithm is adapted to solve the discrete tradeoff problem based on an adaptive serial schedule generation scheme. Finally, an example is provided to examine the algorithm performance.
  • Keywords
    construction industry; cost reduction; industrial economics; normal distribution; project management; quality control; scheduling; stochastic programming; MRCPSP; binary normal distribution; construction project quality; failure cost; multimode resource constrained project scheduling problem; nonlinear stochastic programming; project management; shuffled flog-leaping algorithm; time-cost-quality tradeoff; total quality cost minimization; Accidents; Availability; Indexes; Maintenance engineering; Receivers; Sociology; Statistics; non-linear stochastic programming; project scheduling; shuffled flog-leaping algorithm; time-cost-quality tradeoff;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Management Science & Engineering (ICMSE), 2014 International Conference on
  • Conference_Location
    Helsinki
  • Print_ISBN
    978-1-4799-5375-2
  • Type

    conf

  • DOI
    10.1109/ICMSE.2014.6930458
  • Filename
    6930458