DocumentCode
1275183
Title
The retardation method of loss determination as applied to the large Niagara Falls generators
Author
Johnson
Author_Institution
Niagara Falls, N.Y.
Volume
45
Issue
10
fYear
1926
Firstpage
1016
Lastpage
1018
Abstract
R. B. Williamson: The testing of large generating units after they have been installed in the power station is becoming more common than was formerly the case because the great increase in size has rendered satisfactory factory testing very costly; in many cases it is, in fact, impracticable because the machines are not completely wound and assembled at the factory. There is no doubt that a great deal of money has been expended in the past on unsatisfactory factory tests that could have been made to much greater advantage after installation. Any methods of testing, therefore, that are of advantage when machines have been set up ready for use are worthy of very careful study and we are much indebted to Mr. Johnson for the present paper which shows the application of the retardation method to some of the largest hydroelectric units so far built.
fLanguage
English
Journal_Title
A.I.E.E., Journal of the
Publisher
ieee
ISSN
0095-9804
Type
jour
DOI
10.1109/JAIEE.1926.6537320
Filename
6537320
Link To Document