Title :
Use of frequency changers for interconnection of power systems
Author_Institution :
Brooklyn Edison Co., Brooklyn, N. Y.
fDate :
4/1/1925 12:00:00 AM
Abstract :
FOLLOWING an extensive study into the cost of power as delivered to the customer, the Brooklyn Edison Company adopted the policy of supplying all the increase in business at 60-cycle alternating-current and curtailing the direct-current load within the capacity of the existing substations. With the 25-cycle generation confined primarily to the supply of power to the direct-current system all new prime movers are being installed with 60-cycle generators. The 25-cycle system is therefore left in a position of barely holding its own.
Journal_Title :
A.I.E.E., Journal of the
DOI :
10.1109/JAIEE.1925.6537442