DocumentCode :
1278721
Title :
Engineering foundation
Volume :
44
Issue :
10
fYear :
1925
Firstpage :
1163
Lastpage :
1163
Abstract :
Plans featuring the concrete arch test dam to be erected on Stevenson Creek about 60 miles from Fresno, have been received at Institute Headquarters. These show some of the unique engineering achievements to be introduced into this structure, and give general dimensions, location and application of test pressures to be used in this gigantic investigation of structural values being undertaken in the interest of engineering accomplishment.
fLanguage :
English
Journal_Title :
A.I.E.E., Journal of the
Publisher :
ieee
ISSN :
0095-9804
Type :
jour
DOI :
10.1109/JAIEE.1925.6537934
Filename :
6537934
Link To Document :
بازگشت