DocumentCode :
1283186
Title :
Rehabilitation of the Connors Creek plant
Author :
Greene, R.
Author_Institution :
Detroit (Mich.) Edison Company
Volume :
54
Issue :
6
fYear :
1935
fDate :
6/1/1935 12:00:00 AM
Firstpage :
610
Lastpage :
617
Abstract :
A decision as to when and how an electric power plant should be rehabilitated is largely a matter of judgment. In deciding to begin rehabilitation of the Connors Creek plant in 1933, the engineers of the Detroit Edison Company gave careful consideration to many factors including obsolescence of equipment, expected load growth, and general economic conditions. In deciding to rehabilitate the plant by replacing the boilers and generating units, they studied carefully such factors as the better heat rate obtainable with new equipment, the possibility of salvaging parts of the old plant, operating and maintenance costs, and reliability. This rehabilitation program is scheduled to be carried out in 4 major steps, the first of which will be completed during 1935. The process of reasoning followed in the development of this program and the principal results obtained and anticipated are outlined in this paper.
fLanguage :
English
Journal_Title :
Electrical Engineering
Publisher :
ieee
ISSN :
0095-9197
Type :
jour
DOI :
10.1109/EE.1935.6538761
Filename :
6538761