• DocumentCode
    1288143
  • Title

    Industrial notes

  • Volume
    54
  • Issue
    3
  • fYear
    1935
  • fDate
    3/1/1935 12:00:00 AM
  • Firstpage
    356
  • Lastpage
    356
  • Abstract
    Westinghouse Awarded Steel Mill Order. — The first important steel mill electrification announced in 1935 includes an award to the Westinghouse Electric & Mfg. Co. for part of the electrical equipment to be installed in the McDonald Works of the Carnegie Steel Co., near Youngstown, O. Large d-c motors, totaling 16,000 hp, motor generator sets, and control equipment comprise the bulk of the order. The new mill is expected to be in operation this summer.
  • fLanguage
    English
  • Journal_Title
    Electrical Engineering
  • Publisher
    ieee
  • ISSN
    0095-9197
  • Type

    jour

  • DOI
    10.1109/EE.1935.6539697
  • Filename
    6539697