Author_Institution :
Electric Furnace Co., Ltd., London, England
Abstract :
A summary of progress during 1934 and part of 1935 in electric furnace developments in Europe has been prepared by D. F. Campbell, a leading authority on the electrometallurgical industry in Europe, at the request of the Institute´s committee on electrochemistry and electrometallurgy. The summary is presented herewith for the information of the Institute´s membership.