• DocumentCode
    1296387
  • Title

    Distribution transformer loading

  • Author

    Paulson, N.L.

  • Author_Institution
    Portland General Electric Co., Portland, Oreg.
  • Volume
    82
  • Issue
    2
  • fYear
    1963
  • Firstpage
    136
  • Lastpage
    139
  • Abstract
    Load demand estimated from kilowatt-hour energy data has been adopted as the principle guide for installation or change-out of distribution transformers serving residential load at a large utility in Oregon. This article discusses the special problems connected with transformer loading, the technical considerations of a low-cost test program, and the step-by-step development of a kilowatt-hour guide for economic loading of distribution transformers
  • fLanguage
    English
  • Journal_Title
    Electrical Engineering
  • Publisher
    ieee
  • ISSN
    0095-9197
  • Type

    jour

  • DOI
    10.1109/EE.1963.6541305
  • Filename
    6541305