DocumentCode
1297154
Title
Pilot protection
Author
Hunt, Richard ; Adamiak, Mark ; King, Al ; McCreery, Steel
Author_Institution
GE Digital Energy, Markham, ON, Canada
Volume
15
Issue
5
fYear
2009
Firstpage
51
Lastpage
60
Abstract
The traditional solutions for protecting networked distribution lines, subtransmission lines, and industrial facility incoming supply lines use some form of pilot protection. A significant challenge for pilot protection, especially in retrofit situations, is the cost of installing pilot communications channels.
Keywords
digital radio; telecommunication channels; digital radio; networked distribution lines; pilot communications channels; pilot protection; retrofit situations; subtransmission lines; Circuit faults; Communication channels; Costs; Digital communication; Digital relays; Industrial plants; Power system protection; Protective relaying; Substation protection; Voltage;
fLanguage
English
Journal_Title
Industry Applications Magazine, IEEE
Publisher
ieee
ISSN
1077-2618
Type
jour
DOI
10.1109/MIAS.2009.933402
Filename
5200924
Link To Document