DocumentCode :
1298080
Title :
Some reminiscences of Niagara
Author :
Lincoln, P.M.
Volume :
53
Issue :
5
fYear :
1934
fDate :
5/1/1934 12:00:00 AM
Firstpage :
720
Lastpage :
725
Abstract :
Although almost microscopic as compared with modern electric generators, the 5,000-hp generators installed at Niagara Falls in 1895 had a capacity of about 4 times that of the largest generator previously built. Some of the early operating experiences at Niagara are related here by a past-president of the Institute who was the first operating superintendent and who was in charge of the construction and operation of the original Buffalo-Niagara 11,000-volt 3-phase transmission line.
fLanguage :
English
Journal_Title :
Electrical Engineering
Publisher :
ieee
ISSN :
0095-9197
Type :
jour
DOI :
10.1109/EE.1934.6541624
Filename :
6541624
Link To Document :
بازگشت