• DocumentCode
    1298080
  • Title

    Some reminiscences of Niagara

  • Author

    Lincoln, P.M.

  • Volume
    53
  • Issue
    5
  • fYear
    1934
  • fDate
    5/1/1934 12:00:00 AM
  • Firstpage
    720
  • Lastpage
    725
  • Abstract
    Although almost microscopic as compared with modern electric generators, the 5,000-hp generators installed at Niagara Falls in 1895 had a capacity of about 4 times that of the largest generator previously built. Some of the early operating experiences at Niagara are related here by a past-president of the Institute who was the first operating superintendent and who was in charge of the construction and operation of the original Buffalo-Niagara 11,000-volt 3-phase transmission line.