• DocumentCode
    1298820
  • Title

    Tracking Progress through Earned Value

  • Author

    Erdogmus, H.

  • Volume
    27
  • Issue
    5
  • fYear
    2010
  • Firstpage
    2
  • Lastpage
    7
  • Abstract
    Considered a gross misnomer by some, earned value for progress tracking in software development projects is still little known in the software industry. But the concept shouldn´t be so unfamiliar: tracking progress by earned value is similar to tracking progress through burndown charts-the ubiquitous, simple and powerful visuals that are so popular in agile software development. The two techniques, although developed independently in very different contexts, are similar in terms of their information content. This isn´t a new discovery: Alistair Cockburn talked about the relationship between earned value and burndown charts as early as 2004 in Chapter 3 of his book Crystal Clear (Addison-Wesley, 2004). Section 7.3 of Gngori Melnik´s and Gerard Meszaros´ volume 1 of Acceptance Test Engineering Guide also discusses the same relationship.
  • Keywords
    DP industry; project management; software development management; software prototyping; agile software development; burndown charts; earned value; progress tracking; software development projects; software industry; burndown charts; cost variance; earned value; earned value management; performance measurement; project management; schedule variance; software engineering;
  • fLanguage
    English
  • Journal_Title
    Software, IEEE
  • Publisher
    ieee
  • ISSN
    0740-7459
  • Type

    jour

  • DOI
    10.1109/MS.2010.130
  • Filename
    5551010