• DocumentCode
    1298888
  • Title

    Florida Power Corporation´s load management system

  • Author

    Davis, A. Scott

  • Author_Institution
    Florida Power Corp., St. Petersburg, FL, USA
  • Volume
    3
  • Issue
    2
  • fYear
    1990
  • fDate
    4/1/1990 12:00:00 AM
  • Firstpage
    11
  • Lastpage
    15
  • Abstract
    An overview is given of the load management system started by Florida Power Corporation (FPC) in 1981 to defer 825 MW of additional peaking capacity needed by January of 1995. It is a volunteer program with over 260000 residential customers presently participating and 40000 customers being added each year. These customers allow FPC to interrupt selected appliances in return for a credit on their electric bills. The load management controller consists of dual-redundant HP-1000 computers, each with a dedicated terminal and keyboard, 20 Mbyte hard disk, and 5.25 in floppy disk drive. They run identical software and are loaded with the same database. The load management database resides on the corporate mainframe computer. FPC is in the initial phases of specifying a new controller that will be able to communicate with the Energy Control Center computer system. An expert system in the new controller will be able to develop strategies on short notice to conform to changing operating conditions.<>
  • Keywords
    expert systems; load management; mainframes; microcomputer applications; power system computer control; 20 MByte; 825 MW; USA; controller; database; dual-redundant HP-1000 computers; electric utilities; expert system; load management; mainframe; peaking capacity; power system computer control; software; Control systems; Databases; Drives; Expert systems; Flexible printed circuits; Floppy disks; Hard disks; Home appliances; Keyboards; Load management;
  • fLanguage
    English
  • Journal_Title
    Computer Applications in Power, IEEE
  • Publisher
    ieee
  • ISSN
    0895-0156
  • Type

    jour

  • DOI
    10.1109/67.53223
  • Filename
    53223