• DocumentCode
    1301641
  • Title

    Bottlenecks in Bernoulli Serial Lines With Rework

  • Author

    Biller, Stephan ; Li, Jingshan ; Marin, Samuel P. ; Meerkov, Semyon M. ; Zhang, Liang

  • Author_Institution
    GM R&D & Planning, Gen. Motors Corp., Warren, MI, USA
  • Volume
    7
  • Issue
    2
  • fYear
    2010
  • fDate
    4/1/2010 12:00:00 AM
  • Firstpage
    208
  • Lastpage
    217
  • Abstract
    The bottleneck (BN) of a production system is a machine with the strongest effect on the system´s throughput. In this paper, a method for BN identification in serial lines with rework and Bernoulli machines is developed. The method can be applied using either calculated or measured data on blockages and starvations of the machines. For the case of calculated data, a technique for evaluating performance measures of Bernoulli lines with rework is developed. Along with these quantitative contributions, the paper provides three qualitative results. First, it shows that Bernoulli lines with rework do not observe the property of reversibility. Second, it demonstrates that downstream machines may have a larger effect on the throughput than upstream ones. Third, it demonstrates that BNs may be shifting not only because of changes in machine and buffer parameters but also due to changes in quality of parts produced.
  • Keywords
    machinery; Bernoulli machines; Bernoulli serial lines; bottleneck identification; performance evaluation; production system; Bernoulli machines; bottleneck identification; serial line with rework;
  • fLanguage
    English
  • Journal_Title
    Automation Science and Engineering, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    1545-5955
  • Type

    jour

  • DOI
    10.1109/TASE.2009.2023463
  • Filename
    5208309