DocumentCode
1301641
Title
Bottlenecks in Bernoulli Serial Lines With Rework
Author
Biller, Stephan ; Li, Jingshan ; Marin, Samuel P. ; Meerkov, Semyon M. ; Zhang, Liang
Author_Institution
GM R&D & Planning, Gen. Motors Corp., Warren, MI, USA
Volume
7
Issue
2
fYear
2010
fDate
4/1/2010 12:00:00 AM
Firstpage
208
Lastpage
217
Abstract
The bottleneck (BN) of a production system is a machine with the strongest effect on the system´s throughput. In this paper, a method for BN identification in serial lines with rework and Bernoulli machines is developed. The method can be applied using either calculated or measured data on blockages and starvations of the machines. For the case of calculated data, a technique for evaluating performance measures of Bernoulli lines with rework is developed. Along with these quantitative contributions, the paper provides three qualitative results. First, it shows that Bernoulli lines with rework do not observe the property of reversibility. Second, it demonstrates that downstream machines may have a larger effect on the throughput than upstream ones. Third, it demonstrates that BNs may be shifting not only because of changes in machine and buffer parameters but also due to changes in quality of parts produced.
Keywords
machinery; Bernoulli machines; Bernoulli serial lines; bottleneck identification; performance evaluation; production system; Bernoulli machines; bottleneck identification; serial line with rework;
fLanguage
English
Journal_Title
Automation Science and Engineering, IEEE Transactions on
Publisher
ieee
ISSN
1545-5955
Type
jour
DOI
10.1109/TASE.2009.2023463
Filename
5208309
Link To Document