• DocumentCode
    1303094
  • Title

    Sizewell B-the first of the UK´s PWR power stations

  • Author

    Bindon, F. John L

  • Volume
    4
  • Issue
    3
  • fYear
    1990
  • fDate
    5/1/1990 12:00:00 AM
  • Firstpage
    113
  • Lastpage
    117
  • Abstract
    The building of Britain´s first PWR power station began in April 1987 at Sizewell. The project was subject to the closest public scrutiny on its design, safety and economical aspects. The 340-day Public Inquiry was the longest ever held in the UK. The author reports on a conference held in September 1989 which discussed progress to date. The design of the power station is discussed, and in particular the safety aspects. The equipment, and control and instrumentation are also discussed
  • Keywords
    fission reactor core control and monitoring; fission reactor safety; fission reactor theory and design; nuclear power stations; PWR power stations; Sizewell B; control; instrumentation; safety;
  • fLanguage
    English
  • Journal_Title
    Power Engineering Journal
  • Publisher
    iet
  • ISSN
    0950-3366
  • Type

    jour

  • Filename
    53231