Influence of lot arrival distribution on production dispatching rule scheduling and cost in the final test process of LSI manufacturing system
Author
Chikamura, A. ; Nakamae, K. ; Fujioka, H.
Author_Institution
Dept. of Inf. Syst. Eng., Osaka Univ., Japan
Volume
145
Issue
1
fYear
1998
fDate
1/1/1998 12:00:00 AM
Firstpage
26
Lastpage
30
Abstract
Seven production dispatching rules in the real final test process of one-chip microcomputers are evaluated through an event-driven simulation analysis with regard to the total number of processed lots, the number of tardy lots, the average turnaround time (TAT) and the cost per chip. Several lot arrival distributions during one month are assumed to simulate the fact that the arrival lots tend to increase toward the end of the month but drop near the beginning of the next month. Simulated results for six months show that the rule which considers the time required for jig exchange, the time required for temperature change, the lot waiting time in queue and also the remaining processing time of the machine in use is superior to others. The rule processes about 99% of the planned number of lots and the ratio of tardy lots to processed lots is less than 1%, even when the deviation of lot arrival distribution with respect to the uniform distribution changes from 0% to 50%. The average test TAT and the test cost per chip are about 5% and 70% with respect to those for the well-known first-in first-out (FIFO) rule
Keywords
discrete event simulation; dispatching; integrated circuit yield; large scale integration; production control; production engineering computing; production testing; scheduling; LSI manufacturing system; average turnaround time; cost per chip; event-driven simulation analysis; final test process; first-in first-out rule; lot arrival distribution; lot waiting time in queue; number of tardy lots; one-chip microcomputers; parametric models; production cost; production dispatching rule scheduling; remaining processing time; time required for jig exchange; time required for temperature change; total number of processed lots; turnaround time;
fLanguage
English
Journal_Title
Science, Measurement and Technology, IEE Proceedings -
Publisher
iet
ISSN
1350-2344
Type
jour
DOI
10.1049/ip-smt:19981664
Filename
656056
Link To Document