DocumentCode :
1305744
Title :
An integrated approach for modeling uncertainty in aggregate production planning
Author :
Thompson, S. Daniel ; Davis, Wayne J.
Author_Institution :
Dept. of Gen. Eng., Illinois Univ., Urbana, IL, USA
Volume :
20
Issue :
5
fYear :
1990
Firstpage :
1000
Lastpage :
1012
Abstract :
An integrated solution approach for studying uncertainty in the aggregate production planning problem is proposed. Procedures for evaluating and utilizing the results provided by the integrated solution approach are also presented. This modeling methodology is demonstrated on a multiple-product fixed-workforce example. The example considers three product types, three processes, and 13 planning periods. Uncertainties in selling price, cost, demand, capacity, consumption of capacity, and retention of backorders are modeled, and different capacity levels and demand trends are examined. The solutions provided by a few simplified planning strategies are evaluated and compared for two of the capacity levels. These evaluations and comparisons indicate that a simple control law could provide very robust solutions for this example
Keywords :
Monte Carlo methods; mathematical programming; production control; Monte Carlo methods; aggregate production planning; capacity; consumption; cost; demand; integrated approach; mathematical programming; multiple-product fixed-workforce; retention of backorders; selling price; uncertainty; Aggregates; Linear programming; Mathematical model; Mathematical programming; Optimization methods; Production planning; Resource management; Stochastic processes; Strategic planning; Uncertainty;
fLanguage :
English
Journal_Title :
Systems, Man and Cybernetics, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9472
Type :
jour
DOI :
10.1109/21.59965
Filename :
59965
Link To Document :
بازگشت