DocumentCode :
1308301
Title :
The SSD graph: a tool for project scheduling and visualization
Author :
Lee-kwang, Hyung ; Farrel, J.
Author_Institution :
Korean Inst. of Technol., Taejon, South Korea
Volume :
35
Issue :
1
fYear :
1988
fDate :
2/1/1988 12:00:00 AM
Firstpage :
25
Lastpage :
30
Abstract :
A graphic tool, the SSD (structure, states and deviation) graph, is proposed for three important phases of project management; planning and scheduling, control, and evaluation. The SSD graph represents the structure, states (scheduled and actual states), and deviation of a system. A project management system using the SSD graph is developed, and it visualizes the actual state of a project and keeps the historical record of the project performance. This system allows a project manager to see the overall status and to review the project performance. Several applications have shown its usefulness for scheduling and control of project systems
Keywords :
management; scheduling; SSD graph; historical record; project control; project evaluation; project management; project performance; project planning; project scheduling; project visualisation; system deviation; system states; system structure; Bars; Control system synthesis; Control systems; Dynamic scheduling; Gallium nitride; Graphics; Petri nets; Production management; Project management; Visualization;
fLanguage :
English
Journal_Title :
Engineering Management, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9391
Type :
jour
DOI :
10.1109/17.6001
Filename :
6001
Link To Document :
بازگشت