• DocumentCode
    1308505
  • Title

    Third rail and trolley system of the West Jersey and Seashore Railroad

  • Author

    Duer, J.V.B.

  • Volume
    34
  • Issue
    6
  • fYear
    1915
  • fDate
    6/1/1915 12:00:00 AM
  • Firstpage
    1237
  • Lastpage
    1253
  • Abstract
    The paper recites the details and cost of construction of the contact systems as originally installed and subsequently modified and extended, including third rail, third rail insulators, protection, joint and cross bonding, track bonding and trolley structure. Operating experiences, as creepage of third rail, sleet formation on third rail, deterioration of rail bonds and detentions to train movements chargeable to failure of these structures, are related. The cost of maintaining the various contact structures for seven consecutive years, in cost per single track mile per year, is presented. Results of actual measurement of third rail and track resistances are also given.
  • Keywords
    Contacts; Copper; Degradation; Insulation life; Insulators; Rails; Tracking;
  • fLanguage
    English
  • Journal_Title
    American Institute of Electrical Engineers, Proceedings of the
  • Publisher
    ieee
  • ISSN
    0097-2444
  • Type

    jour

  • DOI
    10.1109/PAIEE.1915.6590212
  • Filename
    6590212