DocumentCode
1308505
Title
Third rail and trolley system of the West Jersey and Seashore Railroad
Author
Duer, J.V.B.
Volume
34
Issue
6
fYear
1915
fDate
6/1/1915 12:00:00 AM
Firstpage
1237
Lastpage
1253
Abstract
The paper recites the details and cost of construction of the contact systems as originally installed and subsequently modified and extended, including third rail, third rail insulators, protection, joint and cross bonding, track bonding and trolley structure. Operating experiences, as creepage of third rail, sleet formation on third rail, deterioration of rail bonds and detentions to train movements chargeable to failure of these structures, are related. The cost of maintaining the various contact structures for seven consecutive years, in cost per single track mile per year, is presented. Results of actual measurement of third rail and track resistances are also given.
Keywords
Contacts; Copper; Degradation; Insulation life; Insulators; Rails; Tracking;
fLanguage
English
Journal_Title
American Institute of Electrical Engineers, Proceedings of the
Publisher
ieee
ISSN
0097-2444
Type
jour
DOI
10.1109/PAIEE.1915.6590212
Filename
6590212
Link To Document