DocumentCode
1308627
Title
The combined operation of steam and hydraulic power in the Pennsylvania Water and Power Company System
Author
Walls, John Abbet
Volume
34
Issue
10
fYear
1915
Firstpage
2299
Lastpage
2306
Abstract
The paper relates the experience of a large hydroelectric development on an erratic river, in endeavoring to accomplish most effective combined steam and hydroelectric operation, indicating that a river may be developed to an extent many times its low water flow where there is extended cooperation between customer and power company in determining, by experimenting, the economy of further supply of hydroelectric power. A plea is made for drawing up power contracts in a fashion to encourage effective combined operation of hydroelectric plant with customer´s existing steam equipment.
Keywords
Abstracts; Boilers; Companies; Contracts; Maintenance engineering; Rivers; Shape;
fLanguage
English
Journal_Title
American Institute of Electrical Engineers, Proceedings of the
Publisher
ieee
ISSN
0097-2444
Type
jour
DOI
10.1109/PAIEE.1915.6590235
Filename
6590235
Link To Document