DocumentCode
1313030
Title
Planning for powerߞ a look at tomorrow´s station sizes
Author
Bennett, R.R.
Author_Institution
Ebasco Services Inc.
Volume
5
Issue
9
fYear
1968
Firstpage
67
Lastpage
72
Abstract
Favorable sites for utility power stations are becoming more difficult to obtain due to the demands of other industries and urban developments. A utility must plan for generating facilities long in advance of the time they are needed to meet system load growth. A major problem will be to find sufficient sites for the required generating facilities to meet the system demands. Successful planning must consider the types and sizes of generating equipment to come. The author looks into the future to forecast the unit and plant sizes for which plans must be made in the next 20 years.
Keywords
Art; Demand forecasting; Fuel cells; Inductors; Magnetohydrodynamic power generation; Nuclear power generation; Power generation; Power industry; Production; Resistance heating;
fLanguage
English
Journal_Title
Spectrum, IEEE
Publisher
ieee
ISSN
0018-9235
Type
jour
DOI
10.1109/MSPEC.1968.5214391
Filename
5214391
Link To Document