Title :
The Baldwin-Westinghouse Chicago, Milwaukee & St. Paul electric locomotives
Author_Institution :
Westinghouse Elec. & Mfg. Co., East Pittsburgh, Pa.
fDate :
4/1/1920 12:00:00 AM
Abstract :
IN the summer of 1917, the Chicago, Milwaukee & St. Paul Railway Company issued specifications covering the apparatus necessary for the electrification of their line from Othello to Seattle and Tacoma. The following were the principal requirements for passenger locomotives as finally determined by the Railway Company:
Keywords :
Axles; Gears; Rail transportation; Resistance; Switches; Voltage control; Wheels;
Journal_Title :
American Institute of Electrical Engineers, Journal of the
DOI :
10.1109/JoAIEE.1920.6591566