Eskom transmission live line maintenance techniques and practices
Author :
Marshall, Eric
Author_Institution :
Power Delivery Eng. unit, Eskom Group Technol., Eskom, South Africa
fYear :
2014
fDate :
21-23 May 2014
Firstpage :
1
Lastpage :
9
Abstract :
The Eskom transmission network comprises of some 30 000 kilometres of HV and EHV overhead transmission line ranging in voltage from 220 kV to 765 kV AC and 533 kV DC. Quality and continuity of supply and network outage constraints requires the use of live line maintenance techniques to achieve required network performance and circuit availability. Stick and bare hand techniques using insulated ladders, insulated aerial platforms, rope hoisting methods and helicopters are utilised to gain access to live conductors and structures to carry out essential preventative maintenance. Tools and techniques have been developed and optimised for local conditions and designs, based on maintenance requirements and available resources.
Keywords :
electrical safety; power overhead lines; preventive maintenance; EHV overhead transmission line; Eskom transmission live line maintenance technique; Eskom transmission network; HV overhead transmission line; circuit availability; helicopters; insulated aerial platforms; insulated ladders; live conductors; local condition; maintenance requirement; network outage constraints; optimised condition; preventative maintenance; rope hoisting methods; stick and bare hand techniques; supply outage constraints; voltage 220 kV to 765 kV; Helicopters; Inspection; Live line maintenance; helicopter; insulated aerial platforms; rope access; safe approach distance; stick and bare hand;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Live Maintenance (ICOLIM), 2014 11th International Conference on
Conference_Location :
Budapest
Type :
conf
DOI :
10.1109/ICOLIM.2014.6934328
Filename :
6934328
Link To Document :
بازگشت