DocumentCode
131847
Title
Live working as an example of electrical installation maintenance with the zero accidents philosophy
Author
Lovrencic, V. ; Gomiscek, B.
Author_Institution
C&G d.o.o., Ljubljana, Slovenia
fYear
2014
fDate
21-23 May 2014
Firstpage
1
Lastpage
8
Abstract
Live working can be considered a contribution to safety at work, as it is an example of electrical installation maintenance with the zero accidents philosophy. The purpose of this paper is to promote the concepts of maintenance work without accidents or with “zero accidents”. Live working can be identified as an unquestionable foundation of business excellence. This paper introduces the legitimacy of implementing and carrying out live working from the perspective of safety and health at work, critically analyses accidents that happen at work in a de-energized state and arguments the goals of implementing live work as work with “zero injuries”. Organisations with an integrated management system have excellent organisational conditions for safe implementation of live work and can therefore achieve the goal “zero defects” or the idea “zero accidents” or “zero injuries” at work due to electrical shock.
Keywords
electrical installation; maintenance engineering; occupational health; occupational safety; electrical installation maintenance; electrical shock; integrated management system; live working; maintenance work; organisational conditions; work health; work safety; zero accidents philosophy; zero defects; zero injuries; Benchmark testing; Companies; Indexes; Safety; Systematics; Total quality management; Business excellence; LW; PDCA cycle; integrated management system; live working; zero accidents;
fLanguage
English
Publisher
ieee
Conference_Titel
Live Maintenance (ICOLIM), 2014 11th International Conference on
Conference_Location
Budapest
Type
conf
DOI
10.1109/ICOLIM.2014.6934344
Filename
6934344
Link To Document