DocumentCode
131880
Title
Supplying power to a new industrial consumer a new work technique in live-line developed to change the type of towers
Author
Barros, Icaro Igor C. De M. ; da Silva, Uilson V.
Author_Institution
EDP ESCELSA, Brazil
fYear
2014
fDate
21-23 May 2014
Firstpage
1
Lastpage
5
Abstract
This article presents the live-line work technique, which has been developed to change the type of a tower from suspension to tension. It was necessary to allow the sectioning of the 138 kV Overhead Power Distribution Line. This allows to power a new industrial consumer in a new double circuit, without interruption of the supply of an industrial customer already in operation connected to the 138 kV Overhead Power Distribution Line. Stages of planning and implementation are detailed in this article, with particular attention to the adopted safety measures adopted for the successful development of the activity.
Keywords
poles and towers; power distribution lines; power overhead lines; double circuit; industrial consumer; live-line work technique; overhead power distribution line; planning; safety measures; suspension; tension; towers; voltage 138 kV; Libraries; Substations; Electricity supply industry; New procedures in live working; Occupational safety;
fLanguage
English
Publisher
ieee
Conference_Titel
Live Maintenance (ICOLIM), 2014 11th International Conference on
Conference_Location
Budapest
Type
conf
DOI
10.1109/ICOLIM.2014.6934378
Filename
6934378
Link To Document