  • Abstract
    This paper presents the benefits of interconnections for power and energy exchanges between electrical utilities as the justification for the unique Eel River Scheme. The objectives, design and performance of the HVDC facility are described to give an overview of this 320 MW power transmission link, the first such undertaking by an electrical utility to utilize thyristor valves. Schemes previously commissioned by utilities had employed ionic valves. The paper notes the high availability and reliability, exceeding 99.6% for at least one of the two links, being experienced.
  • Keywords
    HVDC transmission; Power harmonic filters; Reactive power; Rivers; Thyristors; Valves; Voltage control;
  • fLanguage
    English
  • Journal_Title
    Electrical Engineering Journal, Canadian
  • Publisher
    ieee
  • ISSN
    0700-9216
  • Type

    jour

  • DOI
    10.1109/CEEJ.1977.6592831
  • Filename
    6592831