DocumentCode
1323906
Title
Some transmission line tests
Author
Lewis, W.
Author_Institution
General Electric Company, Schenectady, N. Y.
Volume
40
Issue
6
fYear
1921
fDate
6/1/1921 12:00:00 AM
Firstpage
492
Lastpage
506
Abstract
IN THE MONTH of October, 1919, Mr. J. H. Foote of the Consumers Power Co., and the writer made a series of tests on the 30-cycle 140,000-volt system of that company in western Michigan. A summary of the tests for corona loss has been published.1 There are some interesting features of these tests which were not mentioned in the previous paper, as their explanation was not clear at that time. The questions in regard to these features have now been pretty well cleared up and they will be discussed´ briefly in this paper.
Keywords
Corona; Current transformers; Humidity; Junctions; Power transformers; Voltage transformers;
fLanguage
English
Journal_Title
American Institute of Electrical Engineers, Journal of the
Publisher
ieee
ISSN
0360-6449
Type
jour
DOI
10.1109/JoAIEE.1921.6593020
Filename
6593020
Link To Document