Priority evaluation and ranking of transmission system projects computer models and results
Author :
Morozowski, M.F. ; Melo, A.C.G. ; Pereira, M.V.F. ; Pinto, L.M.V.G. ; Ramos, D.S.
Author_Institution :
Centro de Pesquisas de Energia Eletrica, Rio de Janeiro, Brazil
Volume :
5
Issue :
3
fYear :
1990
fDate :
8/1/1990 12:00:00 AM
Firstpage :
1017
Lastpage :
1023
Abstract :
The authors describe a methodology for identifying which subset of transmission investments in a given expansion plan can be postponed in order to meet a preestablished budget constraint with the least possible impact on system performance. The methodology is based on the ranking of scheduled reinforcements by a cost/benefit index. The cost corresponds to the deterioration of operating conditions (e.g. increased risk of load curtailment) if the equipment is postponed. The benefit is associated with the financial relief brought by the postponement. A computational package for determining this ranking has been developed and is being used by the Brazilian utilities as a subsidy for deciding the adjustment of their expansion plans
Keywords :
economics; power system planning; project engineering; Brazilian utilities; budget constraint; computer models; cost/benefit index; project ranking, project evaluation; transmission system projects; Computational modeling; Costs; Delay; Fuel economy; Linear programming; Load flow; Performance evaluation; Power system modeling; Power system reliability; System performance;
fLanguage :
English
Journal_Title :
Power Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0885-8950
Type :
jour
DOI :
10.1109/59.65933
Filename :
65933
Link To Document :
بازگشت